ON THE ON THE TABLE HERE AND WE HAVE A QUORUM PRESENT.
[1.CALL TO ORDER]
SO I WILL CALL TO ORDER THE MEETING OF THE BURLESON TAIPEI ECONOMIC DEVELOPMENT CORPORATION FOR TONIGHT.FIRST ITEM ON OUR AGENDA IS CITIZEN APPEARANCES.
SINCE WE ONLY HAVE BETH AND JUSTIN HERE THAT ARE NOT A PART OF THE MACHINE.
I SUPPOSE IF EITHER ONE OF Y'ALL WANT TO ADDRESS IT, FEEL FREE.
BUT OTHER THAN THAT IF ANYONE ELSE HEARS US ANYWHERE WOULD LIKE TO SPEAK, THIS IS YOUR TIME.
[3.A.Consider approval of the minutes from the March 18, 2024 Economic Development Corporation (Type A) meeting. (Staff Contact: Amanda Campos, City Secretary)]
MEETING. MEMBERS, THE MEETING MINUTES ARE IN FRONT OF YOU.IF YOU HAVE A MINUTE TO PERUSE THEM, I'LL TAKE A MOTION ON APPROVAL OR DENIAL.
DON'T EVERYBODY SPEAK AT ONCE.
ALL THOSE IN FAVOR? MOTION PASSES BY UNANIMOUS VOTE.
NEXT UP IS THREE B, TO CONSIDER APPROVAL OF RESOLUTION 4A05202024 WEST SIDE LIFT FOR PARTIAL FUNDING
[3.B.Consider approval of resolution 4A05202024 WestSideLift for partial funding in the amount of $2,800,000.00 for the total project cost ($7,802,299.00) to construct the Burleson Westside Lift Station, Force Main, and Gravity Sewer. (Staff Contact: Michelle McCullough, Assistant Director/City Engineer)]
IN THE AMOUNT OF $2.8 MILLION FOR THE TOTAL PROJECT COST 7.8022 99.TO CONSTRUCT THE BURLESON WEST SIDE LIFT STATION, FORCE MAIN AND GRAVITY SEWER.
THIS WILL BE PRESENTED BY MICHELLE MCCULLOUGH, ASSISTANT DIRECTOR OF CITY ENGINEER.
HOPE YOU ALL HAD A GOOD WEEKEND.
I KNOW YOU GUYS ARE A LITTLE BIT FAMILIAR WITH THIS, BUT A LITTLE BIT OF BACKGROUND.
JUNE 7TH, 2021 THE CHAPTER 380 ECONOMIC DEVELOPMENT AGREEMENT WAS APPROVED.
AND CURRENTLY THE AGREEMENT DOES STATE THAT THE LIFT STATION FORCE MAIN 21 INCH GRAVITY SEWER.
LAKEWOOD DRIVE WOULD BE DESIGNED AND CONSTRUCTED BY RA DEVELOPMENT.
LAKEWOOD DRIVE IS CURRENTLY UNDER CONSTRUCTION, AND I BELIEVE WE ARE GETTING READY TO OPEN UP THE SECTION BETWEEN 1020 AND 1016, HOPEFULLY BY EITHER THIS WEEK OR NEXT WEEK.
AND SO THOSE FOUR LANES ARE ANTICIPATED TO BE OPEN.
WE DO ANTICIPATE THE TXDOT PERMIT EARLY SEPTEMBER.
WE GOT THE SCOPE FOR THE ENVIRONMENTAL.
AND THEN THE PERMANENT EXTENSION OF LAKEWOOD DRIVE IS UNDER DESIGN.
CONSTRUCTION FUNDING HAS NOT BEEN IDENTIFIED, BUT WE ARE WORKING ON STEPS WITH TXDOT AND COG.
FOR SOME FUNDING, HOPEFULLY TO CONSTRUCT THAT IN THE NEXT SEVERAL YEARS.
SO JUST A RECAP OF THE HOOPER BUSINESS PARK INFRASTRUCTURE.
STORMWATER RETENTION DESIGN IS UNDERWAY.
WE STILL ANTICIPATE TO AWARD AND START CONSTRUCTION SUMMER OF 2024.
THE 20 INCH JCSUD WATER LINE IS SUBSTANTIALLY COMPLETE.
I BELIEVE CONSTRUCTION HAS BEGUN DOWN ON 917 GOING NORTH ON FM 1902.
AND THEN THE REST OF THE ELECTRIC WILL FOLLOW BETWEEN 1020 AND FM OR SORRY, 1016 AND FM 1902.
AND AGAIN, JUST A MAP, A LITTLE EXHIBIT SHOWING WHERE EVERYTHING IS LOCATED.
HERE IS THE LIFT STATION SITE.
AND WHAT YOU'RE SEEING IS, OF COURSE, THE LIFT STATION OR, SORRY, THE DETENTION SCHEMATIC COUPLE PAD SITES, AND THEN THE GRAVITY MAIN THAT WILL SERVE THE BUSINESS PARK AND CHISHOLM SUMMIT IS WILL COME UP AND ENTER THE LIFT STATION FROM THE SOUTHWEST.
SO WE APPROACHED THIS ONE A LITTLE DIFFERENTLY WITH A COMPETITIVE SEALED METHOD.
THIS IS A FAIRLY LARGE LIFT STATION.
WE DO NOT HAVE ONE THIS SIZE IN THE CITY.
IT'S PRETTY TECHNICAL, LITTLE INTRICATE.
SO WE WANTED TO MAKE SURE THAT THE CONTRACTOR THAT WAS SELECTED DOES HAVE THE EXPERIENCE FOR IT.
[00:05:01]
AND SO WHAT THE COMPETITIVE SEAL PROCESS DOES, WE HAD FIVE CRITERIA THAT ONCE WE REVIEWED THE PROPOSAL, ASSIGNED POINTS FOR THE SUBMITTALS AND THEN THE EVALUATION TEAM, WE COULD HAVE ELECTED TO HOLD INTERVIEWS.BUT THERE WAS A CLEAR FRONT RUNNER.
SO THE ORIGINAL COMPETITIVE SEAL PROPOSAL WAS INITIATED ON FEBRUARY 19TH.
THE PROPOSALS WERE PUBLICLY RECEIVED MARCH 25TH AND THEN APRIL 2ND AREA DEVELOPMENT AND CITY MANAGEMENT MET TO DISCUSS THE CONTRACT ADMINISTRATION, AND IT WAS AGREED THAT THE CITY WOULD TAKE THIS ONE OVER AND THAT WE WOULD REJECT ALL PROPOSALS AND THEN RE-ADVERTISE.
AND THEN YOU WILL, AT A LATER DATE SEE A 380 AMENDMENT.
SO THE RE-ADVERTISED COMPETITIVE SEAL PROPOSAL, THE ADVERTISE IT WAS ADVERTISED ON APRIL 19TH.
TONIGHT WE ARE HERE TO RECOMMEND AWARDING TO MOUNTAIN CASCADE OF TEXAS, LLC FOR A TOTAL CONTRACT AMOUNT OF $7.8 MILLION, WITH 2.8 COMPRISING OF FOUR A BONDS AND 5.8 COMPRISING OF WATER WASTEWATER.
THE NOTICE TO PROCEED, IF AWARDED, IS ANTICIPATED TO BE ISSUED EARLY JUNE.
SO THE ACTION REQUESTED IS TO APPROVE A RESOLUTION FOR PARTIAL FUNDING IN THE AMOUNT OF $2.8 MILLION TO CONSTRUCT THE BURLESON WEST LIFT STATION, FORCE MAIN AND GRAVITY SEWER PROJECT. AND THEN LISTED ON THE SCREEN ARE THE NEXT STEPS.
IF APPROVED TONIGHT, NOTICE TO PROCEED WOULD BE ISSUED EARLY JUNE.
WE RECENTLY PATCHED A LOT OF THE POTHOLES THERE BECAUSE IT WAS GETTING PRETTY BAD.
SO THIS WOULD BASICALLY MILL AND OVERLAY THAT SECTION, AND THEN THE LIFT STATION FORCE MAIN AND REMAINING GRAVITY SEWER IS ANTICIPATED AGAIN TO BE COMPLETED JULY 2025. AND I AM HERE FOR ANY QUESTIONS.
WHAT? WHICH SECTION OF COUNTY ROAD 914 A? SO 914 BETWEEN 1020 AND 914 A SO I DON'T LET ME SEE IF I HAVE A MAP.
NO, I DIDN'T SEE. WHAT I DIDN'T MENTION IS THE FOUR.
WE HAD FOUR PROPOSALS SUBMITTED.
OH, THERE WE GO. SO 914 A IS RIGHT HERE.
SO THE POTHOLES WERE GETTING PRETTY BAD ALONG THIS STRETCH.
WE HAVE GONE OUT THERE AND PATCHED THOSE RECENTLY TO GET US BY.
BUT THAT IS ONE OF THE REASONS WHY WE WANTED THE 21 INCH.
IT'S GOING TO BE CONSTRUCTED IN THE NORTHWEST BOUND LANE IN THE MIDDLE.
1020 AND THEN WE WILL GET OFF INTO THE PARKWAY.
OKAY. AND THAT'S HOW BIG A LINE.
AND THEN IT GOES DOWN TO A 16 INCH FORCE MAIN.
SO WE'LL HAVE ANOTHER MANHOLE ALONG THAT STRETCH THAT THE 16 INCH WILL DUMP INTO.
ALL RIGHT. ANYBODY ELSE QUESTIONS? ALL RIGHT. YOU GOT ONE.
OKAY. I'VE GOT A QUESTION HERE JUST AS SOON AS I GET TO IT.
IT'S MORE OF AN EDUCATIONAL QUESTION.
IT WAS ON THE PROJECT CRITERIA.
THE PROPOSAL PRICE 40 POINTS, 15 POINTS 20, 20 AND FIVE.
SINCE I'M NOT IN THAT BUSINESS, I DON'T UNDERSTAND IT.
DON'T PRETEND TO UNDERSTAND WHAT ANY OF THOSE MEAN.
BUT DO THE PEOPLE THAT QUALIFY FOR THE RFP, DO THEY HAVE TO MEET THAT, OR DO WE PICK THE ONE THAT'S CLOSEST TO IT? SO THERE WAS CRITERIA.
IT'S THE ONE WITH THE LOWEST COST GAIN THE HIGH OR WAS ASSIGNED THE HIGHEST SCORE.
AND THEN FROM THERE IT WAS A PERCENTAGE FOR THE OTHER THREE.
WERE THEY IN BUDGET, NOT IN BUDGET.
PROJECT APPROACH, HOW WOULD THEY APPROACH THIS PROJECT IN ORDER TO GET IT COMPLETED IN 365 DAYS? AND SO EACH OF US ON THE EVALUATION TEAM, READ THE PROPOSALS INDEPENDENTLY AND SCORED THEM BASED ON WHAT THEY
[00:10:10]
MET OUT OF THAT CRITERIA FOR EACH OF THOSE SECTIONS.OKAY. AND MOUNTAIN CASCADE OF TEXAS CAME THE CLOSEST.
THEY CAME CLOSEST AT 88 POINTS.
BELT CONSTRUCTION CAME IN SECOND.
AND THEN OF COURSE, WESTERN MUNICIPAL AND BLUE STAR.
THAT'S WHAT I NEED TO KNOW. OKAY.
I DID WANT TO COMMENT THAT I'VE LONG BEEN AN ADVOCATE OF THE CITY CHOOSING THIS, THE COMPETITIVE SEAL PROPOSAL METHOD FOR AWARDING MAJOR CONTRACTS, JUST SIMPLY BECAUSE WE'VE HAD SOME PRETTY SOUR EXPERIENCES IN THE PAST WHEN WE'VE HAD TO ACCEPT THE LOWEST BID FOR A PROJECT.
IT'S VERY DIFFICULT TO IT'S VERY DIFFICULT TO REJECT A LOW BID BECAUSE TYPICALLY THE BURDEN OF PROOF IS ON THE CITY TO PROVE THAT THAT LOW BIDDER IS NOT QUALIFIED.
BUT THERE ARE PEOPLE WHO WILL BID PROJECTS THAT THEY HAVE NEVER DONE BEFORE.
THE CSP IS JUST A GREAT WAY FOR THE CITY TO CUSHION ITSELF AGAINST THE OBLIGATION OF AWARDING A CONTRACTOR WHO HAS A SKETCHY REPUTATION OR NO REPUTATION AT ALL, ESPECIALLY ON A VERY TECHNICAL, LARGE, DIFFICULT PROJECT.
WE'RE EXPERIENCE AND BACKGROUND MATTERS MORE THAN YOU CAN IMAGINE.
SO I HOPE WE DO MORE AND MORE PROJECT SUBMISSIONS THIS WAY.
AND THE GOOD CONTRACTORS LIKE IT.
IT'S STILL VERY POSSIBLE FOR A NEW CONTRACTOR IF HE CAN SHOW PERSONAL EXPERIENCE IN THE PAST AND WORKING UNDER OTHER COMPANIES, IT DOESN'T NECESSARILY KEEP PEOPLE START UP COMPANIES FROM BEING ABLE TO ENTER THE MARKET, BUT THEY HAVE TO SHOW THAT SOMEBODY CONNECTED TO THAT ORGANIZATION KNOWS HOW TO DO THE WORK AND DO IT WELL AND AND PROVE IT. SO IT'S AS IT SHOULD BE.
AND I'M GLAD TO SEE THAT WE'VE GONE THIS WAY.
ALL RIGHT. ANY OTHER QUESTIONS? ALL RIGHT. READY FOR A MOTION? I'LL MAKE A MOTION TO APPROVE.
I'LL SECOND. OKAY I HAVE A MOTION BY SCOTT, SECONDED BY RUSSELL TO APPROVE ALL THOSE IN FAVOR.
AND THAT MOTION PASSES BY UNANIMOUS VOTE.
ALL RIGHT, NEXT UP ON OUR AGENDA TONIGHT IS ITEM THREE C, TO CONSIDER APPROVAL OF RESOLUTION 4A05
[3.C.Consider approval of resolution 4A05202024LakewoodLandscape, authorizing the reimbursement of R.A. Development, Ltd., for costs associated with design of landscaping and irrigation for Lakewood Drive pursuant to an existing Chapter 380 and Economic Development and Performance Agreement in the amount of $90,000. (Staff Contact: Eric Oscarson, Deputy City Manager)]
2024 LAKEWOOD LANDSCAPE AUTHORIZING THE REIMBURSEMENT OF OUR DEVELOPMENT LIMITED FOR COST ASSOCIATED WITH DESIGN OF LANDSCAPING AND IRRIGATION FOR LAKEWOOD DRIVE PURSUANT TO AN EXISTING CHAPTER 380 AND ECONOMIC DEVELOPMENT AND PERFORMANCE AGREEMENT IN THE AMOUNT OF $90,000, AND THIS WILL BE PRESENTED BY ERIC OSCARSSON, DEPUTY CITY MANAGER. GOOD AFTERNOON.IN KEEPING WITH THE CHISHOLM SUMMIT DISCUSSION, TONIGHT, BEFORE YOU IS A RESOLUTION FOR REIMBURSEMENT TO RA FOR LAKEWOOD DRIVE LANDSCAPE DESIGN.
AS WE KNOW, LAKEWOOD IS UNDER CONSTRUCTION, AND WE'RE MOVING ALONG PRETTY WELL.
AND SO THE 4A ECONOMIC DEVELOPMENT CORPORATION IS AUTHORIZED TO AUTHORIZE THAT REIMBURSEMENT.
SO, AS WE KNOW, LAKEWOOD DRIVE IS A FOUR LANE DIVIDED ROADWAY.
WITH DIFFERENT VARYING TOTAL COSTS FOR CONSTRUCTION AND MAINTENANCE.
BASED ON THAT FEEDBACK, WE HEARD A COMBINATION OF THINGS FROM COUNCIL WAS FOR A MORE IN DEPTH LANDSCAPING COMING OFF OF 1902 THROUGH THE ROUNDABOUT AND THEN TAPERING DOWN TO LESS OF SOME LANDSCAPING.
AS WE GOT AWAY FROM THE MAJOR CORRIDORS, WE HIT HEADED TOWARDS TEN, 1016, I'M SORRY.
1020. AND SO BASED ON THAT FEEDBACK STAFF WORKED WITH RA DEVELOPMENT AND A LANDSCAPE ARCHITECT TO GET A SCOPE AND FEE FOR THE DESIGN OF THAT LANDSCAPING.
THIS IS A QUICK BREAKDOWN OF THE $25 MILLION WE HAVE SET ASIDE FOR THE LAKEWOOD DRIVE PROJECT.
WE'VE TALKED THROUGH PEDESTRIAN LIGHTING.
WE KNOW THAT PEDESTRIAN OVERHEAD ELECTRIC LOOKS LIKE IT'S GOING TO BE UNDER BUDGET.
LANDSCAPE PARKWAY LOOKS LIKE, WITH DESIGN.
[00:15:02]
AND EVEN AT THE HIGHER END FOR CONSTRUCTION, WHICH WE THINK THAT WILL BE LESS THAN THAT WILL BE UNDER THE $2.5 MILLION LANDSCAPE DESIGN AND CONSTRUCTION.AND I'M HAPPY TO ANSWER ANY QUESTIONS.
READY FOR A MOTION? I'LL SECOND.
SECOND BY ADAM TO APPROVE, THOSE IN FAVOR.
AND THAT MOTION PASSES BY A UNANIMOUS VOTE.
NEXT UP TONIGHT IS ITEM THREE D, TO CONSIDER APPROVAL OF RESOLUTION 4A05 202024 BLACK ROCK
[3.D.Consider approval of resolution 4A05202024BlackRockCoffee, authorizing a Performance Agreement between the Burleson 4A Economic Development Corporation and C&C Burleson, LLC for the design and construction of the modification of an existing hooded left turn lane along SW Wilshire Blvd. (Staff Contact: Michelle McCullough, Assistant Director of Public Works/City Engineer)]
COFFEE, AUTHORIZING A PERFORMANCE AGREEMENT BETWEEN THE BURLESON 4A ECONOMIC DEVELOPMENT CORPORATION AND C AND C BURLESON, LLC FOR THE DESIGN AND CONSTRUCTION OF THE MODIFICATION OF AN EXISTING HOODED LEFT TURN LANE ALONG SOUTHWEST WILSHIRE BOULEVARD.THIS WILL BE PRESENTED BY MICHELLE MCCULLOUGH.
GOOD AFTERNOON. MICHELLE MCCULLOUGH, ASSISTANT DIRECTOR OF PUBLIC WORKS.
AND AS MENTIONED, I'M HERE TO TALK ABOUT A PERFORMANCE AGREEMENT FOR THE OLD CHINA KING SITE.
POTENTIAL DENTIST OFFICE AS WELL.
A LITTLE BIT OF BACKGROUND HERE.
CITY COUNCIL DID RATIFY THE 4A'S, 4A ACTION.
SO JUNE 19TH, PRIOR TO THE AGREEMENT, THE SITE PLAN WAS ADMINISTRATIVELY APPROVED.
AND THEN NOVEMBER 3RD, 2023, THE NOTICE TO PROCEED WAS ISSUED FOR THE PUBLIC INFRASTRUCTURE.
AND IF YOU'VE DRIVEN BY THEN I BELIEVE THEY HAVE GONE VERTICAL NOW.
SO THERE ARE MULTIPLE DRIVEWAY CONNECTIONS WITH FEW DEDICATED RIGHT TURN LANES ON WILSHIRE.
ADDING RIGHT TURN LANES DOES LOWER.
WELL, IT DOESN'T LOWER SAFETY.
IT RAISES SAFETY, BUT IT DOES AND THE LEVEL OF SERVICE, WELL, THAT'S A LITTLE MISTAKE THERE.
AND SO WHEN DEVELOPMENTS DO COME IN ALONG 174, WE DO TAKE THE OPPORTUNITY TO TAKE A LOOK AT IT AND SEE HOW CAN WE PARTNER WITH THE DEVELOPER, HOW HOW CAN WE CONSOLIDATE, REMOVE OR IMPROVE EXISTING DRIVEWAYS.
AND I GOT IT RIGHT ON THE SMALL BULLET.
IT DOES INCREASE SAFETY AND LEVEL OF SERVICE THERE.
SO THE FORMER, A LITTLE BIT ABOUT THE FORMER CHINA KING SITE.
THE EXISTING DRIVEWAY IDENTIFIED FOR REMOVAL IS NOT REQUIRED BY TXDOT.
SO WHEN WE MET WITH THEM, WE TOOK A LOOK AT IT TO SEE WHAT WE COULD DO IF THERE WAS ANYTHING.
AND SO WE SET ABOUT TALKING TO THE DEVELOPER ABOUT PARTNERING AND REMOVING THAT SOUTHERN DRIVEWAY.
BUT IN ORDER TO DO THAT, THE HOODED LEFT TODAY COMES TO THIS DRIVEWAY.
SO WE NEED TO PULL THAT BACK IN ORDER TO MAKE IT TO THE SHARED ACCESS DRIVE.
TXDOT DID REQUIRE THE RIGHT TURN LANE, AND SO WHAT WE HAVE TALKED WITH THE DEVELOPER AND WHAT TXDOT HAS AGREED IS WHILE WE WORK THROUGH ALL OF THIS, THEY CAN GO AHEAD AND CONSTRUCT THE RIGHT TURN LANE, LEAVE THAT DRIVE IN THERE FOR NOW AS A TEMPORARY DRIVEWAY, BUT IT WILL HAVE TO BE REMOVED WHEN THE HOODED LEFT IS MODIFIED IF APPROVED. AND SO THE PROPOSED IMPROVEMENTS ARE SHOWN IN THE SCHEMATIC HERE.
REMOVAL OF THE EXISTING SOUTH DRIVEWAY.
MODIFICATION OF THE HOODED LEFT TO PULL IT BACK TO THE EXISTING SHARED DRIVEWAY.
THE LEVEL OF SERVICE WILL BE INCREASED ALONG THIS PORTION OF THE ROADWAY.
THE TOTAL ESTIMATED COST FOR THE CONSTRUCTION AND DESIGN IS 409,596.
AND SO THE COUNCIL, OH, THAT'S WRONG TOO.
[00:20:02]
WILSHIRE. MICHELLE, THE SOUTHERNMOST AREA, WHICH IS NOW PAVEMENT AND WILL BE DEMOLISHED.IS THAT GOING TO BE REPLACED WITH LANDSCAPING, CONSISTENT WITH WHAT WE HAVE? SO THEY DO HAVE.
WELL, NOT ALONG THE YOU'RE TALKING ABOUT IN THE? IN THE MEDIAN. YES.
SO WE'RE LOSING LANDSCAPING AREA WHERE WE'RE BACKING ALL OF THE STUFF.
I'M REALLY SURPRISED THAT THEY THINK THEY NEED THAT MUCH STORAGE.
DID ANYONE EVER DISCUSS THE POSSIBILITY THAT THEY DON'T? WELL, WE DID, BUT THEY HAVE CRITERIA AND YOU WOULD HAVE TO GET A VARIANCE FOR IT.
AND TXDOT IS NOT ONE TO ISSUE VARIANCES.
SO WE HAD TO GO AHEAD AND MODIFY THE REST OF IT.
TXDOT IS REQUIRING AS PART OF THE DEVELOPMENT.
YES. THE REMOVAL OF THE DRIVEWAY AND THE MODIFICATION OF THE HOODED LEFT IS NOT REQUIRED BY TXDOT.
BUT ONCE THE HOODED LEFT IS ALTERED, THEN THAT DRIVEWAY HAS TO CLOSE IT.
IT WILL BE PART OF THE PERMIT THAT IT HAS TO BE REMOVED.
OKAY. THERE ARE PARKING SPACES HERE.
BUT THESE ARE WHAT CAUSE ACCIDENTS.
AND THESE ARE WHAT SLOW TRAFFIC DOWN.
AND ALL THESE SLOW MOVEMENTS TAKE PLACE OUTSIDE OF THE DRIVING LANES, THEN WE ALL BENEFIT.
AND WE MAY NEVER GET THEM ALL, BUT IT WOULD HELP.
WE'RE TRYING. EVERY TIME ONE COMES IN, WE TRY.
I KNOW YOU ALL DO. AND IT'S GOOD TO SEE THAT YOU DO.
ALL RIGHT. ANY OTHER QUESTIONS OR READY FOR A MOTION? I'LL MOVE TO APPROVE.
AND THAT MOTION PASSES WITH UNANIMOUS VOTE.
NEXT ON OUR AGENDA IS ITEM FOUR, WHICH IS A CHANCE TO ASK FOR FUTURE AGENDA ITEMS. REPORTS. HAVE WE ANY REQUESTS? I SEE NONE. HAVE WE A NEED FOR EXECUTIVE SESSION THIS EVENING? ALL RIGHT. WE DO NOT. SO WE WILL ADJOURN THE MEETING AT 4:55.